The facility had existing solar panels and solar equipment and was looking to upgrade from the main switchboard (800A) to a bigger board (1600a) to allow for future load expansion.
PDS designed the necessary electrical drawings, including
the main electrical equipment, gas meter, and water line. Deliverables included a plot plan, a single-line diagram, and a load summary.
• Electrical Drawings Design: Created designs for the main electrical equipment, gas meter, and water line.
• Deliverables Provided:
• Plot plan
• Single-line diagram
• Load summary