The Microgrid project is designed to include two complimentary components. The installation of a new microgrid system consisting of a 126-kW carport system with a 1200 kW/600 kWh Battery Energy Storage System (BESS) coupled with (3) 1.2 MW natural gas-fired generator sets, a new AGO Congelo chiller, exhaust gas treatment system (SCR), and evaporative cooling tower to electric power self-generation independent of utility supply.
Project Development Solutions provided project engineering, design and permitting support, onsite construction management of all sub-contractors (electrical, civil, structural, mechanical, etc.) and successfully executed the scheduling, delivery, offloading, and installation of the major electrical equipment (HV switchgear, MV switchgear, transformers, battery storage), Gas Powered gensets (3), cooling tower, ammonia refrigerated chiller (AGO Congelo), ammonia system, for gas engines Selective Catalytic Reduction (SCR), with a weight range from 1 to 90+ tons.
Deliverables Provided:
• Coordinating and managing the development of the Scope
of Work (SOW).
• Acting as the project management team.
• Collaborating with customers and third-party technical
resources.
• Defining and documenting project objectives.
• Developing a stakeholder register.
• Identifying and documenting required Authority Having
Jurisdiction (AHJ) approvals and permits.
• Gathering and documenting demonstration facility
requirements and expectations.
• Developing conceptual cost estimates and project
timelines.
• Documenting project execution strategy.
• Facilitating and coordinating third-party SOW review and
feedback.
support@avante.com
123 Fifth Floor East 26th Street,
New York, NY 10011
PDS Office: +1 (661)-847-9254
1601 New Stine Road Suite 222
Bakersfield, CA 93309
© 2025 PDS Project Consultants | All Rights Reserved – Design: CreativeWox